Home › Forums › Resident Engineer’s Toolbox › Bridge Maintenance Resources › Reply To: Bridge Maintenance Resources
08/11/2020 at 9:09 AM
#9538
Hilde
Moderator
Here is a link to IDOT’s bridge railing standard details, which includes the R-27 detail for TEMPORARY CONCRETE BARRIER FOR STAGE CONSTRUCTION which are the details for placing TCB on bridge decks.